Sunday 29 December 2013

Manual Rotary Evaporator

Uses:The device through electronic velocity control, the flask within the highest many appropriate below the constant velocity of rotation, below the vacuum within the heating temperature, such that proliferation of evaporation regarding the solution bottle, and then condensation solvent recovery. Is a biological, pharmaceutical, chemical, food, higher institutions and scientific research, laboratories and other units for the concentration, crystallization, separation, recycling and other essential machinery ideal. Primary technical indicators: 1. Host speed? 0-150 r or min, electronic variable speed. RE-52B? 0-100 r or min.



Maximum lifting distance: 150 mm. Force Supply: AC 220V 10%, 50HZ, input force 1KW. Dimensions: 370 530 750 length width height. Is simple with automatic up and below lifting devices, touch up the host keys up, below button touch below console, hand-off button that stops, easy to operate. Another available emergency paw wheel, when the lift motor failure shall paw rim rotation, the host can increase or decrease.



A unique seal structure and selection of sealing materials, vacuum good performance. Heat from the digital display, manage achieved by the metal probe sensor, when the sensor into heating tank h2o bath, the h2o heat to heat regarding the force shall automatically slice off the heater when the h2o heat below the selected heat shall automatically be connected heating power, so turn to manage the temperature, constant temperature. dipswitches 100 heat controller to set the median O position. Heating use high-quality stainless steel tank, 220 120 diameter cylinder, a heating force of 1KW, closed-end resistance heater should be installed 2L flask pot rotation. RE-52B 280 180, 2KW, 5L flask 5.



High evaporation rate regarding the vertical condenser system, walls are hunting two-loop cooling h2o pipes created of glass. When the rotating flask, the solution evaporated within the inner spread, and then evaporation of huge diameter pipe into the huge diameter condenser tube to velocity up evaporation. RE-52B, RE-52D use all stainless steel, corrosion-resistant, high-quality utility. Installation angle regarding first adjustment regarding the nose, as long as the right to send the boot lock wrench head should be adjusted, usually to right below the slope of 30 or so, when adjusting the other paw to lift up the nose, should be locked subsequent to adjustment. and help the fixed plate 14 installed within the head on the left the factory to install good, then vertical bar in 14, temporary and do not tighten screws.



Spindle two Installation: each port interface, and the sealing surface grinding, seals should be cleaned, painted prior to installation, need a layer of vacuum grease to prevent leakage. The nut 3 First set regarding the spindle two on, then clamping ring 4 sets of slots slice into the shaft Shen Department to be embedded within the grooves, and Qian into the spindle sleeve 5 within the screw on the nut 3 then a mini hex wrench six Qian people The look for for sunken hole within the head following hole then tighten 2, receiving note of for rotation together with the other paw when the nut 2, to wrench Shen holes then tighten 2, such that spindle lock Instead you can remove the spindle. or rotation 3 spindle sleeve 5 follow the turn. Stone bottle 11 installation: the huge glass nut 9 first set into the four-way bottleneck, then spring ring 10 shall also be set into bottlenecks, the bottleneck on the side regarding the card firmly, and then press install map to Seal Block 7 sets in 1, the PTFE 8. Enclose seats in kind circle seat 8 sets in 1, the final bottle on the Stone huge nut screwed into the nose.



Condensate bottle 16 Installation: First place on stainless steel help clip ring 18 to 16 Qian 11 the mouth, and rotate in close contact with what created the interfaces at this time 18 set into the vertical bar 15, the adjusted position subsequent to 14 and tighten the screw. mounted on the vacuum port connector 17. Feeding tube 12 and the deflation switch 13 the factory was fitted together, turn the handle 90 degrees to play a role in closed or open, and finally install the evaporator liquid bottles and bottle collection and use clamps. Installation diagram: 1. Nose threaded flange 7.



Help the fixed plate 15. Insurance screws RE-52B are equipped 5. Height adjustment: manual lifting, rotating mechanical system column above the paw wheel, cis to rise, reversing the decline. Electric lift, touch up the host keys up, below button touch below the host. Condenser has 3 external connectors are then used in cooling water, a h2o access, the other head on the water, usually running water, condensing h2o temperature, the decreased the better.



Mounted on the vacuum port connector, then vacuum skin vacuum tubes used. Begin prior to first velocity manage knob to minimum L, press the force switch indicator light, and then slowly to right at the compulsory speed, generally huge evaporating bottle, the little speed, a decreased viscosity solution speed. flask is a standard interface, 24, were attached to 500ml, 1000ml 3 flasks, liquid volume is not higher than 50% fit. Glass components tipping should be gently, prior to loading washing clean, dry, or drying. The grinding mouth, sealing surface seals and joints are wanted prior to installing a layer of vacuum grease coating.



Heating tank h2o prior to force does not let h2o and dry. RE-52B should be created of 19 screwed into the hole insurance, the insurance, so as not to damage the flask. For example vacuum and do not need to confirm up two the connector, the interface is sealed 3 ring, the sealing surface is valid 4 vacuum grease between the spindle and the ring is coated well 5 vacuum push and the skin tube space leaks six whether there exists cracks within the glass cases, fragmentation, damage to phenomenon of.

No comments:

Post a Comment